PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor electrical roughing Facing East.jpg 3rd floor interior metal framing Facing North-West.jpg Block work at the 2nd floor UCIA Facing East.jpg Installed ductwork fitings at the 3rd floor Facing West.jpg Installed motorized dampers at the 2nd floor Facing West.jpg Installed roof curbs at the high roof Facing East.jpg Roof curbs at the High Roof Facing South.jpg Run electrical wiring for the 2nd floor motorized dampers Facing North.jpg
Previous pageNext page Installed ductwork fitings at the 3rd floor Facing West
Installed ductwork fitings at the 3rd floor Facing West